Tasks |
|
立德 |
- Distillation startup empc:
- Revise case studies : 28 Nov – 2 Dec
- Revise manuscript: 12 – 30 Dec
- Batch process research proposals (28 Nov - 9 Dec)
- Formulation of the model basis: 28 Oct – 2 Nov
- Problem formulation of batch process research topics: 5 - 9 Dec
- Batch process research:
- Derivation of model basis: 12 - 23 Dec
- Preliminary results from modeling: 26 - 30 Dec
- Organize CO2 work:
- Prepare simulation tools: 12 - 16 Dec
- Simulation of process: 19 - 23 Dec
- Preliminary results of optimization: 26 - 30 Dec
- Revise and submit integrated control and design manuscript: 28
Nov – 9 Dec
|
- Distillation startup empc:
First draft only.
(Starting in AUG. 2016)
- Batch process research proposals:
Incomplete. Unacceptable (Starting in OCT.
2016)
- Batch process research: Do nothing
- Organize CO2 work: Do nothing
(Starting in SEPT. 2016)
- Revise and submit integrated control and design manuscript:
More revision to be carried out.
(Starting in DEC.
2015)
|
林軒 |
- Inductive Learning PCA
- Clustering 方法測試
- PCA in RS --> Linear Model
- PLS vs. PCA (??)
- Paper review: subspace model identification (SMI)
- PLVR 複現
- FPC: 測試
|
- Inductive Learning PCA: Complete
- SMI: Done
- FPC: 測試: Incomplete
|
詠詞 |
- 12/4:Paper review(1)更新
- 12/11:Paper1複現
- 12/18:Deep learning paper review(前半)
- 12/25:Deep learning paper review(後半)
|
- NN+RTR 複現.(未完成)
- CNN 報告.(未完成)
- CFD 報告.(未完成)
|
|
|
|
|
|
|