JUNE 2015

 

 

Tasks

 
正兵
  • 修改Paper 1
  • 完成Paper 2 & 3工業例子
  • 確定Root cause演算法及數值模擬
  • Paper 1 修改
  • Paper 2 部分修改
  • Paper 3 修改
  • root cause analysis算法分析
     
立德
  • Plant-wide soft-sensor
    • Complete case study: 13 June
    • Complete draft: 27 June
  • MF-RtR paper:
    • Complete with update material
  • NN-DR paper:
    • Complete revision (13 June)
  • PV/ extractive distillation manuscript: revise and resubmit (?)
  • GP-DR:
    • Formulation: 13 June
    • Derivation: 27 June
  • Plant-wide soft-sensor: Overall 40% complete:
  • NN-DR paper: 80% complete. Revision ongoing.
  • MF-RtR paper::Initial draft complete. Figures need to be revised.
  • GP-DR: Preliminary framework.
慶洋
  • Proposal第三章 方法撰寫
  • Smoothness constrains 程式改寫
  • Debutanizer數據測試
  • Sample Selections
  • Proposal第三章 方法撰寫(80% 剩下動態方法沒有描述)
  • Smoothness constrains 程式改寫(未做)
  • Debutanizer數據測試(未做)
  • Sample Selections(已回顧)
     
紹武
  • 串級控制於LTV系統辨識(推導及模擬)
  • 閉迴路時變系統控制器性能評估模擬
  • 串級控制於時變系統控制器性能評估(推導與模擬)
  • 兩次ORAL
  • 串級控制於LTV系統辨識(推導及模擬)(模擬未做)
  • 閉迴路時變系統控制器性能評估模擬 (未完整)
  • 串級控制於時變系統控制器性能評估(推導與模擬)( 模擬未做)
健傑    
英礜
  • 完成論文,上傳圖書館